03 / Behind the refurbishment
What changed — and why.
A full bathroom specification, designed around the client’s preferences and informed by professional technical advice, delivered within a ground-floor flat’s limited footprint.
01 / SCOPEFrom strip-out to second fix
Complete removal of the old fixtures and finishes, adaptation of water and electrical connections, preparation, tiling, glazing and second fix. We worked with the client to agree a space-saving layout that reflected his preferences, supported by professional advice on the revised WC and basin positions.
02 / TECHNICAL CHALLENGEMaking the wet-room connection work
The most demanding detail was the shower waste connection in a restricted floor area. The bathroom was rebuilt around that practical constraint rather than hiding it behind a larger tray or bulky enclosure.
03 / CRAFTPrecision niche and ceiling tiling
A wall-to-wall recess with integrated LED profile, carefully mitred tile edges, tiled shower ceiling and matching skirting brought together the different surfaces.
04 / EVERYDAY COMFORTHeat, light and space-saving fittings
Main-floor underfloor heating, partial wall heating for towel drying, a corner-cistern WC, demister mirror, ventilation and Wi-Fi ceiling speakers made the small room work harder.