Rough holes around fittings
We found oversized, ragged cut-outs around the valves and the WC outlet. Every opening was re-cut to fit the fittings neatly.
A two-bedroom new-build flat in Mill Hill, NW7. The new owner chose to replace the developer's tiles with premium large-format 1200 × 600 mm porcelain in both bathrooms, his and hers. The first installer did not complete the job to an acceptable standard, so we took the project over part-way through: we stripped the work back, redid the preparation and waterproofing, retiled both rooms, rebuilt the lit niches and refitted the sanitaryware.
The client had just bought the flat and wanted both bathrooms retiled in premium large-format porcelain. The installer he first chose left the work in a poor state: open joints, rough cut-outs around the valves and the WC outlet, tape still stuck to the feature tiles and badly finished edges at the door frame.
We took the project over mid-way. Rather than tile over the problems, we removed the failed work, prepared and waterproofed the walls again, rebuilt the niches with lighting and retiled both bathrooms. We also refitted and reconnected the whirlpool bath, fitted the sanitaryware and, at the client's request, installed a toilet douche in both bathrooms. The whole project took two weeks.
Large-format tiles show every mistake, so the preparation has to be right before the first tile goes on.
We found oversized, ragged cut-outs around the valves and the WC outlet. Every opening was re-cut to fit the fittings neatly.
Joints were left open, tape was still on the feature tiles and the edges at the door frame were badly finished. We stripped it back and started again.
The walls were prepared again and the wet areas and niches were waterproofed before any tiling.
The niches were rebuilt with lighting and brass-finish trims, and the whirlpool bath was refitted and reconnected.
Use the sliders to compare the walls after we removed the failed work with the finished bathrooms.

DURINGAFTERThe photographs were taken on site from approximately comparable viewpoints, not digitally matched camera positions.
The wall stripped back, with the niche opening and the WC outlet, and the finished wall with the lit mirror niche, the mosaic niche and the wall-hung WC.

DURINGAFTERThe second bathroom during retiling, with the niche framed in brass-finish trim, and the finished room with the round lit mirrors, floating vanity and toilet douche.
Photographs taken on site at Mill Hill, NW7: as we found it, during our work and on completion.
How the bathrooms looked when we took the project over: rough cut-outs, open joints, tape left on the feature tiles and poorly finished edges.
We removed the failed tiling, prepared the walls again and waterproofed the wet areas and the niches.
Both bathrooms retiled in large-format porcelain, with the niches framed in brass-finish trim.
The finished bathrooms, with lit niches, wall-hung WCs and a toilet douche in each.
Send photos of the bathroom as it is now and tell us what was agreed. We will tell you honestly what needs to come out and what can stay.
Customer feedback from Google Reviews. Tap any review to open the Master Tiling Ltd Google listing and read reviews there.
All reviews on Google ↗Share your plans and a few photos. We'll discuss the next steps.